Main Lift Station
This is where all the sewage meets from the city and gets pumped five miles to the treatment plant. This is done with three Fairbanks Morris 300 horse power electric motors with three 12,000 gallon per min pumps. The most ever pumped in a 24 hr period was 27,000,000 gallons.